At a glanceHealthcareGreater CairoHandover 2025Physical Security & SurveillanceStructured Cabling

ClientA private healthcare group operating across Greater Cairo
SectorHealthcare
LocationGreater Cairo
Handover2025
The challenge
Six sites, six different systemsFour video platforms and two access control systems, none of which talked to each other. An incident across two sites meant two operators, two exports and two timelines.
There was no maintenance windowClinical operations run continuously. Every cutover happened alongside a live department.
Controlled areas had to stay both secure and instantClinical staff cannot fight a reader in an emergency, and pharmacy stores cannot be open. Both requirements had to hold at once.
What we delivered
Physical Security & SurveillanceOne VMS across all six sites, access control integrated, retention set to the group's policy
Structured CablingCamera and reader infrastructure into live departments, phased ward by ward
Worked to IEC 62676 (video), EN 60839 (access), TIA-568.
The numbers
640cameras on a single operator position
| Cameras installed or migrated | 640 |
| Sites brought onto one platform | 6 |
| Access controlled doors | 215 |
| Readers and biometric devices | 248 |
| Video retention delivered | 90 days |
| Departments closed for the work | 0 |
| Phased delivery | 22 weeks |
The outcome
Security now runs from one operator position instead of six. An incident review that used to take a day of exports across sites is answered in minutes from a single timeline.
Documentation handed over
- As-built device schedules per site
- Camera coverage records, held internally
- Retention policy configuration
- Operator training records
- O&M manuals
Related
Other projects
2025Real Estate & Construction
Campus backbone across a five-building business park
A Grade A office development in New Cairo
2,400outlets tested and certified
2024Banking & Financial Services
Primary data centre build for a tier-one bank
A tier-one Egyptian bank
99.98%measured availability since handover
2024Industrial & Logistics
Power resilience for a cold chain distribution centre
A regional pharmaceutical distributor
0power incidents in 18 months
Have a site like this one?
Tell us what has to run in it and when it has to be live. We will come back with a scope and a programme, not a brochure