Home/Projects/Industrial and Logistics

Power resilience for a cold chain distribution centre

Protected supply for cold chain control systems, warehouse management and the site network, with a maintenance regime designed at the same time as the system

At a glanceIndustrial & LogisticsSixth of October CityHandover 2024IT Power SolutionsMaintenance & Managed Services
Power resilience for a cold chain distribution centre
ClientA regional pharmaceutical distributor
SectorIndustrial & Logistics
LocationSixth of October City
Handover2024

The challenge

The cost of an outage was already knownProduct loss on a cold chain failure is measured in hours. Everyone on site knew the number, and it set the tolerance for every decision.
The existing UPS had never been load testedNameplate autonomy of twenty minutes. Nobody had confirmed it since installation.
Work had to fit shutdown windowsThe distribution centre runs shifts. Invasive work happened in planned production stoppages, not against them.

What we delivered

IT Power SolutionsModular UPS protecting control systems, WMS and network, generator interface, load tested at commissioning
Maintenance & Managed ServicesPreventive schedule planned around production shutdowns, with condition reporting on the battery estate

Worked to IEC 62040, IEC 60364.

The numbers

0power incidents in 18 months
UPS capacity installed160 kVA, modular
Autonomy at full load, measured22 minutes
Generator and ATS interfaceYes, 250 kVA
Power incidents since commissioning0 over 18 months
Preventive maintenance visits per year4
Average response time achieved2.4 hours against a 4 hour commitment
Invasive work outside shutdown windows0 hours

The outcome

The site has not lost a cold chain hour to a power event since commissioning. Autonomy is now a measured figure the operations manager can quote, rather than a number on a label.

Documentation handed over

  • Load test records at commissioning
  • Single line diagrams
  • Battery condition baseline
  • Preventive maintenance schedule
  • O&M manuals

Related

Other projects

Have a site like this one?

Tell us what has to run in it and when it has to be live. We will come back with a scope and a programme, not a brochure

Message an engineer on WhatsApp